4 0 obj
hbbd``b`~$CC`LZ eQ@dq
;&F d}0 The video camera inspection is to be conducted with a VDOT representative present. 4 to 3/4 in. The loosely placed center section of the bedding allows the pipe to seat itself and helps minimize point loads. or structures. A REVIEW OF THE USE OF RECLAIMED ASPHALT - Read online for free. Effect of Rock-Sized Aggregates on Soil Compaction Results . San Antonio Water System Standard Specifications for Construction ITEM NO. 71 terms. 500 grams is the minimum sample required for soils and for aggregate the sample size depends on the Nominal Maximum Size Aggregate. A trench at the edge of the pavement provides a cavity with the least resistance for water to flow and accommodate pavement drainage. Students must bring valid ID & attend class in order to test. ACI Concrete. Identify typical construction, 02530-1 of 5 SECTION 02530 STORM DRAINAGE STRUCTURES 02530.01 GENERAL A. The camera must have the means to measure deformation/deflection of the pipe. This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. Soils & Aggregate CCWA $ 350.00 $ 250.00 Handson proficiency will be scheduled upon . Students are required to register for classes on the GCC and/or CCWA web sites. JnqYj A"@. VDOT: Soils and Aggregate Compaction. AASHTO T99 The Moisture-Density Relations of Soils using a 5.5-pound Rammer and a 12-inch drop. PIPE INSPECTION AND REPAIR Larry Ritchie February 23, 2010 PIPE INSPECTION AND REPAIR The Florida Department of Transportation builds and maintains hundreds of miles of underground infrastructure as part, SECTION 6000 - EXCAVATION, TRENCHING AND BACKFILLING (Pipeline Construction) 6001 SCOPE. Pipe Culverts 600-1 A. Endwalls, Inlets, Manholes, and Spring Boxes 600-5 2. SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies, SEDIMENT/STORMWATER MANAGEMENT BASIN CONSTRUCTION CHECKLIST For permanent structures per Delaware SCS Pond Code 378 and Delaware Sediment and Stormwater Regulations KEY PROJECT INFORMATION Item meets standard, LS 2540 SEWER LATERALS AND INSPECTION TEES A. In addition, two app roaches, soil compaction, and optimal workability are And the pipe must provide structure, because if the ground above the pipe collapses then the pipe can no longer perform as a conduit. The gradation is the distribution of various particle sizes within the material. In a rigid pipe, this zone has zero effect on the load carrying capacity. Personal Holding C, Civil Service Personal Background Evaluation, Revised 7/16. Download. 32-02.05 Precast Manhole Sections and Castings.
PDF Appendix D - Virginia Test Methods (REVISED) Upstream or down stream? 1. Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. VDOT Soils and Aggregate Compaction: Chapter 2. Sign, fax and printable from PC, iPad, tablet or mobile with pdfFiller Instantly. What is compaction? Culvert Profile. 2016v1.0 Chapter 4 12, 13 Typical Pipe and Box Culvert Backfill: BACKFILL TESTING FREQUENCIES Test Location 4 Compacted Lift Foundation One test per lift on alternating sides of the pipe for each 300 feet of pipe or portion thereof. pipe stiffness 65 psi) 6) An end wall for the protection of the outlet pipe. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent, Beacon Hill Sewer District Standard Specifications Residential Gravity Side Sewer Including Design Criteria and Standard Construction Drawings Residential Gravity Side Sewer Design Criteria 1. Minimum/Maximum Cover All Culverts 24 minimum cover Absolute minimum fill height (12 ) Except for entrances (9 minimum) All pipe should have three feet of cover on it before construction traffic is allowed across it. VDOT uses AASHTO and Unified Soil Classification Systems to classify soils. FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness. If you have questions, please provide us with the course title and number when e-mailing or calling. What term refers to the texture and firmness of a soil? VDOT Soils and Aggregate Compaction 2016v1.0 Chapter 1 | 1 In a flexible pipe this zone must protect the pipe from distortions due to loading extend to 12 above pipe. Additional temporary fill is needed to protect the pipe from construction loads.
PDF a/o May 2018 MATERIALS CERTIFICATION SCHOOLS FREQUENTLY ASKED QUESTIONS 309 0 obj
<>/Filter/FlateDecode/ID[<8C7926BE3CE0893EFFE3D4D04181CA9C><5F163F4C9BEAEE4B999AF08BC3EDB7FD>]/Index[296 27]/Info 295 0 R/Length 74/Prev 443524/Root 297 0 R/Size 323/Type/XRef/W[1 2 1]>>stream
Geotechnical Bulletin PLAN SUBGRADES, SECTION 701 CULVERT PIPE, ENTRANCE PIPE, STORM SEWER PIPE, AND EQUIVALENTS, SECTION 33 05 16.13 PRECAST CONCRETE UTILITY STRUCTURES, Specification Guidelines: Allan Block Modular Retaining Wall Systems, Section 2 Specification 2.18 Concrete and/or Corrugated Steel Storm Sewer TABLE OF CONTENTS, SECTION IV - TESTS AND INSPECTIONS PART 1 - GENERAL. Description 200-2 201 GENERAL 200-2 201.1 SPECIFICATIONS 200-2 201.2 CONNECTION TO EXISTING FACILITIES 200-3 202 MATERIALS 200-3 202.1 PIPES 200-4, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS BY JOHN FLECKENSTEIN PIPELINE AND DRAINAGE CONSULTANTS INTRODUCTION History Of Post, 601.1 601.2(a) SECTION 600 INCIDENTAL CONSTRUCTION SECTION 601 PIPE CULVERTS 601.1 DESCRIPTION This work is construction or reconstruction, inspection, and cleaning of pipe culverts; including subsurface, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer The user may choose to adopt part or all of this Model Specification; however, the user should ensure that all parts, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES PART 1 - GENERAL A. All new construction involves a study and analysis of the on-site soils. If you are currently participating in VDOT's Materials Certification Schools, you can access your Materials CertificationReports via the VDOT University Virtual Campus: VDOT University Virtual Campus Users connect at: https://VirtualCampus.VDOT.Virginia.gov .
VDOT Materials Certification Schools - Business | Virginia Department Public Involvement Manual.
PDF Appendix E Compaction Characteristics and Equipment Submit, SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. 13) What is the maximum allowed crack size of a rigid pipe? All sewer laterals shall tie into the sewer main lines unless approved by the City Engineer. Trenching, Backfilling and Compacting: 02223, DRAINAGE MATS For Vertical: Flow 15-P For Horizontal: Flow 18-H, City of West Linn Public Works Standard Construction Specifications. Cracks shall be digitally scanned to allow for accurate measurement. 1 4 INSTALLATION OF PIPE AND TESTING OF PIPE BACKFILL LEARNING OUTCOMES Understand basic pipe and soil concepts and how they relate to preconstruction issues Understand fundamental trench concepts and pipe installation procedures Understand inspection requirements and backfill testing frequencies and procedures Understand the basic principles of pavement drain construction INTRODUCTION A well installed pipe should stay in service 50 to 100 years with little or no repair. The side is called the drainage side. 11) Backfill depth is at least equal to the diameter of the pipe. OPEN CHANNELS 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT, SECTION 32: SANITARY SEWER INSTALLATION 32-01 SCOPE. x 12 in./ft.
VDOT Soils Flashcards | Quizlet If you have questions, please provide us with the course title and number when e-mailing or calling. 1-800-UNILOCK www.unilock.com FOREWORD This outline specification has been prepared for, CITY OF PETALUMA STORM DRAIN DESIGN AND CONSTRUCTION STANDARDS & SPECIFICATIONS 400 SERIES AUGUST 1999 Revised 10/98 City of Petaluma Petaluma, California STORM DRAIN INSTALLATION DETAIL, Session 7: Retrofitted Edge Drains 7.1 Learning Outcomes 1. When performing a manual visual inspection: There must be adequate crawl/walking space and VDOT Safety Policy and Procedure #8 Confined Space Entry Policy and Procedure must be followed. VDOT Soils and Aggregate Compaction" Download Document. From this we can highlight the following requirements: Visual/ Video Inspection is required on: All Storm Sewer Pipes (100%) Selected Number of Pipe Culverts (>10%) 2016v1.0 Chapter 4 15, 16 Must be done with VDOT Rep Present Conducted no sooner than 30 days after completion of Installation and placement of final cover (except pavement). volume of concrete occupied by the drain pipe in a cast-in-place structure or structure extension. 2 0 obj
Installation PowerPoint for Grasscrete Formers, Specifications for Residential Property Owners Connection to New Public Sewer, DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES, SECTION 200: STORM SEWER CONSTRUCTION STANDARDS, VIDEO INSPECTION AND LASER DEFLECTION TESTING FOR POST CONSTRUCTION QC/QA SPECIFICATIONS AND MAINTENANCE INSPECTIONS, Model Specification 509 DRISCOPLEX 4200 and DRISCOPLEX 4300 Gravity Flow Sanitary Sewer, STANDARD SPECIFICATIONS SECTION 02701 INSTALLATION OF GRAVITY SEWER PIPELINES. 35 terms.
SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE, STANDARD SPECIFICATIONS SECTION 03461 PRECAST REINFORCED CONCRETE MANHOLES AND MANHOLE BASES. hYoF#4rPzL@]Gb)3d@pa@sc/IK^0@Qq. True or false: Open graded aggregates are used in pavement to give the structure more strength. The values are often affected by varying percentages of large aggregate which consultants and contractors do not usually put into consideration. (Provide three) a) b) c) 2) Explain when a rock correction is utilized and what happens to the laboratory maximum dry density and optimum moisture values after a rock . Once a soil or aggregate mixture has been placed in a layer on the embankment, the contractor can use various types of compaction equipment to densify the soil to the desired level of compaction. The goal shall be to collect, C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. In the top 5 feet; perform one test every other lift around the perimeter and continue to the top of the structure. Applications for a zoning district map amendment (rezoning), conditional rezoning, planned development, or conditional use permit shall include a VDOT traffic impact statement (VTIS), and applications for a site plan or preliminary plat shall include a traffic impact statement (TIS), where the proposed development is reasonably anticipated to . 0
x; =@~fKJU
>e A .E,fjd=|
^'(rN_92>#e' ?Ab t40 [$b3F l`fz>q!`\U1Dsb@2l P9 % All materials, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering Geotechnical Bulletin GB 1 PLAN SUBGRADES Geotechnical Bulletin GB1 was jointly developed by the Offices, CHAPTER 6 - SANITARY SEWER 6.1 GENERAL This section covers the requirements for PVC plastic sewer pipe materials and installation in sanitary sewer construction. Portion of Section 2102 . This program will encompass nuclear density testing, one-point proctor and "Speedy" moisture, construction and testing of embankments and subgrade, pipe installation, roller patterns and reports. The compaction equipment will ride on the native soil and not allow for proper consolidation of backfill. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20, RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover, SECTION 33 41 03 POLYVINYL CHLORIDE (PVC) PIPE PART 1 GENERAL 1.01 SECTION INCLUDES A. See the following table for VDOT recommendations.
VDOT Soils and Aggregate Compaction Flashcards | Quizlet Leak Resistant: A joint which limits water leakage at a maximum rate of 200 gallons/inch diameter/mile/day for the pipeline system for the project specified head or pressure. When standing water is in pipe foundation area, No. The original Former is a vacuum formed light gauge plastic mold, The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. SECTION 02720 SANITARY SEWER AND STORM DRAIN SYSTEMS, Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Materials. 2. Civil. 4 in.)
Effect of Rock-Sized Aggregates on Soil Compaction Results Prepared by Risi Stone Systems Used by permission. materials (soils, aggregate and asphalt) in the field, the Geotechnical firm shall be responsible for the continuous monitoring of the placement and compaction of aggregate base materials, asphalt concrete pavement and the placement and compaction of earthwork and backfill of trenches and structures to ensure compliance with the Specifications. (500 grams) of soil. Weigh clean dry container and record weight. We also encourage you to contactJ. R. Noble at james.noble@vdot.virginia.gov to sign up for the MCS Managers report, which is offered to help you better track and manage progress throughout the year. Computer-based testing (CBT) allows NICET to extend several benefits to our customers: more flexible exam dates and appointment times; immediate scheduling and confirmation; and quicker exam scoring.
A copy of the Storm Sewer/Culvert Inspection Report (inspection report)including any video tape/digital Video Recording (DVD)/digital photographs shall be provided to the VDOT Inspector within two business days of the completion of the inspection and made part of the project records. SECTION 9. LD Instructional and Informational Memoranda. 2. This work shall consist of providing pipe or pipe arch of the diameter or shape designated, laid upon a firm bed and backfilled as specified.
endstream
endobj
startxref
2016v1.0 Chapter 4 2, 3 Structural System Structural System Figure 4.2a: Reinforced Concrete Figure 4.2b: Flexible Pipe Culverts are generally designed for the loads they must carry after construction is completed. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete, SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. This website includes hyperlinks to sites neither controlled nor sponsored by VDOT or the Commonwealth of Virginia. VDOTSoilsandAggregateCompaction 6 FIELDMOISTUREANDDENSITYTESTING WITHTHENUCLEARGAUGE LEARNINGOUTCOMES . Screen the sample over a 3/4-inch sieve and replace the aggregate retained with an equal weight of No. 3 0 obj
Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. The trench s dimensions and location are typically 1 foot wide and 2 to 4 inches below the subgrade and adjacent to the pavement edge. 3) 104 in. endobj
VDOT: Soils and Aggregate Compaction.
A Review of The Use of Reclaimed Asphalt | PDF | Road Surface PDF SOILS COMPACTION AND TESTING 2015 - Iowa Department of Transportation As a reminder, all certification courses are available either online or through a self-study option at the respective community colleges. For all roadway projects that are constructed by private contractors for VDOT and for all roadway projects constructed by others that are or will be proposed to be accepted into the VDOT highway system, a visual/video camera post installation inspection is required on all storm sewer pipes and for a selected number of pipe culverts in accordance with the instructions contained in this VTM and Section of the VDOT Road and Bridge Specifications.
PDF Pavement Design Guide for Subdivision and Secondary Roads in Virginia For positive projection embankment installations, the embankment material should be placed and compacted to a minimum of one foot above the pipe and the trench excavated into the embankment. VDOT Soils and Aggregate Compaction 2016v1.0 Appendix D | 1 AASHTO M 145 The Classification of Soils and Soil-Aggregate Mixtures for Highway Construction Purposes.
Cleaning, Inspecting, and Testing Sanitary Sewers B.